City People's Committee Hai Phong said that the investment in wind power projects offshore Ho Chi Minh City. Hai Phong will contribute to turning this locality into a clean energy supply center for the Northern region, serving the goal of strong and breakthrough socio-economic development in the coming period according to Resolution 45-NQ/ TW of the Politburo.
According to the proposal of the City. Hai Phong, Hai Phong offshore wind power project with a scale of 3,900 MW is divided into 3 operating phases from 2029 to 2037. This project is proposed by the joint venture Orsted Taiwan Ltd. and T&T Group Joint Stock Company, the total investment is expected to be 261,000 billion VND and is mobilized from the capital of the enterprise. This project has a survey area of 870 square kilometers and will use 54 hectares of land and 602.5 hectares of water surface.
The built project will contribute to ensuring national energy security, ensuring the reliability of power supply between regions, reducing transmission loss, sharing reserve capacity, and promoting structural transformation. economy in the direction of increasing the proportion of clean industry development.
Hai Phong also believes that the large-scale investment project in the region will make a significant contribution to the state budget, and play a driving role in the development of the local economy in particular as well as the whole region. local jobs.
According to city leaders. In Hai Phong, the Ministry of Industry and Trade is currently submitting to the Prime Minister a draft Power Plan VIII, according to which, the volume of wind power in the North region by 2025 is 346 MW and by 2045 is 1,186 MW and has not been specified. wind power development in the locality.
Thanh Huong (baodautu.vn)